Soil Test

First

Objective of the study: The study of the site survey to determine the strength of soil or rock and cohesion to obtain the soil coefficients for the purposes of design and then to give the types and depths of the foundation.

Second

To do a site survey, you must do the following:

  1. Receive the site and describe the nature of the project in terms of area and number of floors ... etc.
  2. General description of the site in terms of plans and the tendency of the piece and climatic conditions.
  3. General description of the regional geological in terms of the nature of discoveries and geological and geological nature (geological map Pina on the site)
  4. the work of field studies in terms of the number of drilling and deep drilling and the work of field tests such as:
    •  Sampling levels
    • Type of field tests
    • Number of field tests
  5. The samples are extracted from the site and stored in plastic bags and then sent to the laboratory for laboratory tests according to the specifications in terms of the names of the tests and the name of the standard followed and number.
  6. Describe the nature of the materials on the site and describe each layer and types of rocks and soil and the work of geological sections of the layers and the work of drilling records.
  7. Analyzing the results and explaining the reasons for any strange results
  8. Making the necessary conclusions and conclusions, including durability, and the depth of foundation.

- the type of foundation - the type of the foundation layer, the value of the total and uneven landing, lateral pressure of the soil, soil cohesion ... The angle of internal friction, drilling tendencies, determine the validity of the soil resulting from the non -

- Determination of the soil parameters of the retaining walls and the necessary structural design.

Thirdly,

I am laboratory tests of soil:

  1. Unconfirmed pressure (UNCONFINED TEST)
  2. DROPPING AND PUMPING (CONSOLATION)
  3. Triaxial Pressure (TRIAXIAL)
  4. Direct shear (DIRCE SHEAR)
  5. Bulb tolerances
  6. Transmittance
  7. porosity
  8. S.P.T
  9. C.P.T
  10. Detection of water by a piezometer or Rotary machine.
  11. Coring


Fourthly :

The site survey report is prepared and certified by the competent authorities.

Fifth:

Some projects that have been implemented:

  1. Various projects of the General Organization for Housing and Urban Development such as (Muwaqqar, Zarqa al-Majd 1, Zarqa al-Majd, etc.).
  2. Miscellaneous projects of the Ministry of Public Works and Housing schools of education in different governorates.
  3. Miscellaneous school projects for USAID.
  4. Projects for the Ministry of Water such as dam projects, water collection plants and others.
  5. Projects for public security in all governorates of the Kingdom such as Aqaba prison, Qafqafa prison, Tafileh prison, public security chalets in Aqaba and others.
  6. Projects of the Directorate General of the gendarmerie in all the provinces of the Kingdom, such as gated chalets, schools and gendarmerie centers.